WFC- SC(H) Series .Installation - 9 - 4.2 Chilled-Hot Water Piping Water supply and accommodation of expansion of the chilled water circuit is affor
WFC- SC(H) Series .Installation - 10 - A balance valve should be installed in the chilled-hot water outlet and a stop valve should be in
WFC- SC(H) Series .Installation - 11 - A balance valve should be installed in the cooling water inlet and a stop valve installed in the
WFC- SC(H) Series .Installation - 12 - 5. Electrical Wiring. 5.1. Electrical system diagram Figure 5-1-1 illustrates a typical electrical system
WFC- SC(H) Series .Installation - 13 - 5-3. Junction box electrical wiring 5.3.1 Location of Junction box Junction box is located left bottom of
WFC- SC(H) Series .Installation - 14 - 5.3.2. Inside of Junction box wiring In the Junction box there is a noise filter and some connecting termina
WFC- SC(H) Series .Installation - 15 - 5.4. Remote switching If remote operation is required, make the connection according to the follow
WFC- SC(H) Series .Installation - 16 - 5.4.3. Position of RUN-REMOTE-STOP Switch Adjust the "Run-Remote-Stop switch" to the position of t
WFC- SC(H) Series .Installation - 17 - 5.5. Condition output signal If absorption machine operation signal and absorption machine alarm si
WFC- SC(H) Series .Installation - 18 - 6 Water Quality 6.1 General Water used in the chilled-hot water circuit and cooling water circuit
WFC- SC(H) Series .Installation - 1 - Contents Page 1. General Information 1.1 Precautions ...
WFC- SC(H) Series .Installation - 19 - 7 Ambient temperature 7.1 Winter Shutdown If only heating mode of operation is required from the chiller-he
WFC- SC(H) Series .Installation - 20 - Installation Check and Request for Commissioning Yazaki Distributor: …………………………………………………………………. Project Name
WFC- SC(H) Series .Installation - 2 - General Information. 1.1 Precautions The chiller-heater should be installed by trained and qualified
WFC- SC(H) Series .Installation - 3 - 2. Handling 2.1 Rigging Remove the crate and wooden base from the absorption chiller-heater. Lift
WFC- SC(H) Series .Installation - 4 - service, the Yazaki chiller-heater will not perform correctly on a continuous basis without proper
WFC- SC(H) Series .Installation - 5 - platform or walkway should be built such that the chiller-heater, cooling tower and electrical apparatu
WFC- SC(H) Series .Installation - 6 - < For SC50 > Fix the chiller with fixing plate and anchor bolt. The fixing plate and the anchor bolt
WFC- SC(H) Series .Installation - 7 - 4. Piping 4.1 General After leveling the chiller-heater and cooling tower, the chilled-hot water pip
WFC- SC(H) Series .Installation - 8 - *1.Except absorption machine (chain line) must be supplied externally by o